What are the construction methods and construction procedures of steel beam rust removal paint?

2018-04-25 19:12:26

Accumulation of life and work in the small experience, continuous learning can be continuous progress, can let us do things quickly and well. What are the construction methods and construction procedures of steel beam rust removal paint?

Tools/Materials

tool

Methods/Steps
1

Engineering construction needs to have construction management personnel, there should be vice president, deputy, assistant engineer, foreman, safety officer and workshop and foreman

2

The labor organization of the project site needs to have 5 employees, there needs to be a construction worker, and there should be site guards and station guards as well as the two ends of the construction site protection officers

3

According to the requirements of construction, it is generally necessary to configure migrant workers for labor operations, and at least 20 people are needed

4

During the construction process, the construction worker can reasonably increase or reduce the number of migrant workers according to the construction conditions of the site, the daily work content and the size of the workload

5

In the industrial process of engineering construction, the labor force should be organized well, and if there is a change in personnel, it should be reported to the workshop in time

Matters needing attention